Cloud Migration Services that include cutover, handover and source retirement.

We plan and run cloud migration for live applications, data and integrations moving to AWS, Azure or Google Cloud. We assess the estate, sequence the move and carry it through cutover, operating handover and planned decommissioning.

  • 150+Projects delivered across 12 countries since 2012
  • 100+Senior in-house engineers, six countries
  • 5.0Unified rating across 61 client reviews on Clutch
  • AWS CertifiedSolutions Architects on the team
  • ISO 27001Certified security practice, audited by Quay Audit UK

01Overview

Moving a live system to the cloud

We map the running system in a migration readiness assessment, then scope the move against its dependencies and your operating constraints.

  • The source estateWe document the applications, data stores, integrations and licences in the on-premises, hosted or cloud environment you want to move.
  • Plan the migration wavesA wave groups workloads that move together. We use application and data dependencies to sequence the move and define what each wave needs for acceptance.
  • An operating handoverWe define the operating owner and the handover of configuration, monitoring and design decisions. Continuing engineering and support are scoped alongside that responsibility.
  • Choose the scope of cloud workCloud consulting settles architecture priorities and the cloud decision. Cloud infrastructure builds a target environment; migration plans and executes the transition of the running system.

02Proof

Cloud migration results from client projects

Our migration work has covered Microsoft application hosting, hotel booking and a combined server and code replacement.

  • Crik-IT moved its Microsoft applications to AzureCrik-IT's C#, SQL Server and ASP.NET applications moved from an old hosting solution to Azure alongside development and system maintenance. The client highlighted our work to understand the underlying project goal, as well as carrying out the implementation.
    Eliminateddowntime tied to the old hosting, after the Azure move, with latency also significantly reduced
  • Hotel booking infrastructure defined in TerraformThe hotel booking migration introduced Terraform to define and automate infrastructure deployments. The platform gained faster transaction processing and reduced latency after the move, with infrastructure definition supporting future updates and disaster recovery.
    Near-zeropost-migration downtime on the hotel booking platform we moved to a containerized Azure stack
  • Global On Media combined server migration with a complete code rewriteThe work migrated the servers and rewrote the code using .NET Core, React and Stencil.js. Efrat Kalmar, COO, reported: "Site was migrated and re-written, the new system is much more stable, and performance highly improved."
    More stableand considerably improved performance after the server migration and code rewrite, as reported by the client

03Compare

Choose who will run the migration

Compare the team, provider and tooling against responsibilities for application changes, cutover and operation. Your incumbent partner or cloud provider's professional services can also fit where their remit covers those responsibilities.

An engineering firm runs itunicrew Your team, on the provider's toolingIn-house A hosting or managed-services vendorVendor
Best forA migration requiring coordinated application, data and infrastructure engineering, with assessment and execution commissioned together. Best forA team with the migration expertise, domain knowledge and time to plan and operate the transition using provider tooling. Best forWorkloads covered by the provider's migration and operating services, with application requirements included in the agreed remit.
What it asks of youSystem access, business constraints, workload owners and approval of the target, cutover windows and acceptance criteria. What it asks of youEngineering time, dependency decisions, application testing and ownership of cutover, handover and source retirement. What it asks of youConfirming service scope, application changes, data access, operating terms and who handles work outside the provider's remit.
You end up owningThe agreed target configuration, migration plan and operating handover, with artifact, account and licence rights defined. You end up owningA migrated environment and internally maintained plan, tooling and operational knowledge. You end up owningAn agreed migration and operating arrangement, with access, artifacts and service responsibilities specified in the contract.

Quick self-check

Tick the pressures affecting your migration. The recommendation updates as you go.

0 of 4 true

Define the cloud decision

Use cloud consulting to settle architecture priorities, or cloud infrastructure development to build an environment. For a planned move, we can scope migration around the workloads and operating constraints.

Talk it through

Clarify the workload and its constraints

Identify what needs to move, which dependencies it has and who sets the timing. That gives the readiness assessment a defined scope.

Talk it through

Map dependencies before execution

The fixed-scope assessment is quoted on its own. It documents the workload choices, target options and dependency sequence that inform the execution proposal.

Book a discovery call

Sequence the applications and data

Plan which workloads move together and how each wave will be accepted. Your system owners confirm the dependencies, data checks and operating windows.

Book a discovery call

Plan coexistence and source retirement

Budget for both estates during the transition. Define archival and retention requirements, source shutdown and the owners responsible for closing the maintenance and licence arrangements.

Talk about the move

We finish a cloud migration by switching the old estate off. Decommissioning is a stage in our plan, with a date on it. That plan also budgets for the months when both estates run.

Oleksandr TrofimovChief Technology Officer, unicrew

04Capabilities

The migration work we plan and run

We choose cloud migration solutions per workload, including retaining systems that remain suitable where they run today.

  • Cloud migration readiness assessment

    We assess the running estate, compare target architecture options and recommend a strategy per workload across the 6 Rs. The fixed-scope assessment is quoted and delivered on its own.

  • Lift and shift migration services

    We rehost compatible applications and servers with minimal code change. We define the target infrastructure as code and check application, data and integration behavior against the acceptance criteria.

  • Database migration services

    We plan data transfer, schema mapping and integrity checks for targets such as Amazon RDS or Azure SQL. The application and data dependencies determine the sequence.

  • Cloud application re-architecture

    We scope application changes for scaling, availability and resource-use requirements. Refactoring and replacement are distinct choices: the media platform example combined server migration with a complete code rewrite using .NET Core, React and Stencil.js.

  • Cloud to cloud migration services

    Cloud-to-cloud migration

    AWS, Azure or Google Cloud

    We migrate workloads between providers or consolidate cloud accounts. We map identity, managed services, storage and queueing behavior to the target and test the selected interfaces. For Microsoft's cloud, Azure migration covers the specialist service mapping.

  • Hybrid cloud migration

    We plan retained workloads alongside the ones that move, taking account of licences, hardware and data-location constraints. We design the networking, identity and monitoring connections needed between the source and target environments.

  • Cloud cost optimization

    We establish a cost baseline for the moved estate and review instance sizing, scaling policies and resource use. A standalone invoice and cost assessment belongs to the cloud cost and AI-readiness audit.

  • Legacy system decommissioning

    We plan archival, source shutdown and the closure of maintenance and licence arrangements as a dated stage. Your responsible owners approve retention, data-handling requirements and the contract actions needed to retire the estate.

05Trust

Migration records and operating handover

The migration scope includes the technical records and operating handover your team will use after cutover. Ongoing delivery practice is covered by DevOps consulting.

  • In writingWhat runs, and what depends on itA dependency register for migration planning and handover to the operating owner
  • As codeThe target environment, in your repositoryInfrastructure as Code (IaC) in Terraform, so you can rebuild the new environment from your own repository without depending on whoever set it up
  • ClosedThe source estate, archived and switched offSource archiving and shutdown, with maintenance and licence closure agreed with the responsible owners

06Stack

Cloud platforms and migration tools we use

We select AWS, Azure or Google Cloud against application services, data dependencies and operating requirements. Database, queueing, identity and licence compatibility inform the target design, with infrastructure defined in code for the planned environment.

BackendServices, APIs, and business logic
CloudWhere it runs, and what it costs

07Engagement

Three ways to run a migration with us

The engagement defines migration execution and responsibilities after cutover. The assessment can be quoted on its own, and there is no minimum engagement period.

  • We deliver the assessment with target options, workload recommendations and a cost outlook. Execution is then scoped against that assessment, including cutover acceptance and the operating handover.

    Best when
    You need the effort and the risk in writing before you commit
    You pay
    Outcome based, quoted per project
    Typical start
    Two to four weeks
  • We provide continuing engineering for migration and operation, with named responsibilities and knowledge handovers. The scope can include ongoing DevOps consulting for the platform after cutover.

    Best when
    The roadmap continues after cutover and one team should answer for it
    You pay
    Billed monthly, per team member
    Typical start
    Two to four weeks
  • We coordinate the hosting transition with application changes when the architecture also needs to evolve. The programme can combine refactoring, replacement and migration, selected per workload and sequenced around data and integration dependencies.

    Best when
    The system still works but the design has capped what you can do next
    You pay
    Billed hourly, quoted per project
    Typical start
    Two to four weeks
A move that has already started

Map the migration already in progress

We map the workloads on the source and target, the dependencies between them and the checks already completed. That current-state register informs the scope for remaining execution and operating handover.

08Industries

Plan the transition around business operations

Business owners define the operating windows and acceptance requirements that shape each migration wave.

Deepest expertise

Logistics and transportation

Sequence order, dispatch and shipment workloads against their operating dependencies. Define data checks and cutover windows for moving-order workflows and automotive finished-vehicle logistics with the teams using them.

Deepest expertise

Hospitality and leisure

Plan booking and payment dependencies around the operating windows. Our hotel booking migration introduced Terraform-defined infrastructure.

Healthcare

Agree workload locations, patient-data access and retention with the responsible owners. Plan the handling of source records alongside the application move, with approval for archival, shutdown and any disposal.

E-commerce and retail

Sequence storefront, ERP and marketplace workloads against their data dependencies. Define how order, stock and product-information interfaces will be verified during the transition.

Fintech and trading

Scope reconciliation and acceptance for payment, commodity trading (CTRM/ETRM) and bookkeeping workloads. The system owners define the operating windows and checks needed for the transaction data.

EdTech and research

Map storage, media and search interfaces for event-content systems and learning platforms. Coordinate the workload sequence and acceptance windows with the event or academic calendar.

Discuss the cloud migration you want to plan

Tell us about the running system, the target you are considering and your operating constraints. We discuss the assessment scope, workload dependencies and the people who will approve the transition.

Let's talk

What happens after you contact us

  1. We reply within one business dayWe respond to your enquiry and arrange the next conversation about migration scope.
  2. A call about what runs todayWe discuss the source environment, application and data dependencies, target options and operating constraints.
  3. A fixed-scope assessment, written downThe assessment defines the dependency map, target options and per-workload recommendations, with a cost outlook for the transition.
  4. Contracts and NDAs, then a start dateWe settle contracts, NDAs and access for the work. Most engagements start within two to four weeks.

09Delivery

From cloud migration assessment to source retirement

We turn the assessment into an execution plan with defined wave acceptance, operating handover and source retirement. Your workload owners approve the constraints and decisions at each stage.

  1. AssessmentWe map applications, data stores, integrations, licences and dependencies. For the assessment, the NDA precedes access; read-only, least-privilege access is agreed with your technical contact. Your decision-maker confirms the business requirements and target constraints.You getA dependency map, target architecture options on AWS, Azure or Google Cloud, and a recommendation per workload against the 6 Rs.
  2. Sequence the estate into wavesWe group dependent workloads and sequence their move, including the expected period of parallel operation. Your system owners confirm business windows, integration dependencies and acceptance requirements.You getA sequenced plan, wave by wave, with the cost outlook for the target environment.
  3. Landing zone and pipelinesWe define the target in Terraform and configure the networking, identity, backup, monitoring and pipelines in scope. Your technical owner provides or approves the cloud accounts and the build access needed for that environment.You getA target environment defined in Terraform, with CI/CD, monitoring and backup already running.
  4. Cutover, wave by waveWe execute each wave inside the agreed window and check the application and data against the acceptance criteria. Your workload owner verifies the business result. The plan defines who decides what happens if a check fails, based on the application and data state.You getEach wave live on the target, with its data reconciled against the source.
  5. Optimization and decommissioningWe review resource sizing and scaling against a cost baseline, then complete the operating handover and planned source retirement. Your responsible owners approve record retention, archival, shutdown and the maintenance or licence actions in the plan.You getRight-sized, auto-scaling infrastructure with a monitored cost baseline, and the source estate archived and shut down.

10Client voices

Client reviews of migration and engineering work

See our client reviews
5.0 unified ratingacross 61 verified client reviewsRead them on Clutch

12Questions

Questions about cloud migration

Use these answers to assess workload choices, continuity, access, parallel operation and the plan for retiring the source estate.

Cloud migration moves operating applications, data and integrations from on-premises, hosted or cloud environments to a target such as AWS, Azure or Google Cloud.

Our cloud migration services cover readiness assessment, workload strategy, target design, wave planning, cutover and operating handover. The scope includes the transition's cost outlook and planned decommissioning of the source estate, with retention and shutdown approved by the responsible owners.

We quote the migration against its workloads, data conversion, integration dependencies and operating constraints. The fixed-scope assessment is quoted on its own and informs the execution proposal, including target and parallel-running costs.

The billing model follows the engagement:

  • Fixed price: outcome based, quoted per project.
  • Time and materials: billed hourly, quoted per project.
  • Team extension: billed monthly per team member.

Timing depends on workload dependencies, the chosen strategies, data transfer or conversion and the cutover windows your business approves. The readiness assessment produces the sequenced plan from which we agree the schedule.

Rehosting, replatforming and application re-architecture require different work. Target provisioning, application checks and source retirement also need to be included. We confirm the proposed dates against those requirements rather than applying a standard duration to every estate.

Compatibility is part of the migration plan and acceptance checks. We map the application and its ERP, CRM, payment, API, identity and reporting dependencies, then define what must be verified on the target.

Your system owners confirm the required behavior and access. Interfaces that need adaptation affect the scope and wave sequence. Our related Microsoft application migration moved a C#, SQL Server and ASP.NET stack from old hosting to Azure.

Our migration examples include operating business applications and a combined server and code replacement.

  • Microsoft applications on C#, SQL Server and ASP.NET moved from old hosting to Azure.
  • A hotel booking migration introduced Terraform-defined infrastructure.
  • A server migration accompanied a complete code rewrite using .NET Core, React and Stencil.js.

Related technical case studies cover vehicle maintenance, sports applications and event content. We assess your system's dependencies and target requirements when scoping its move.

The downtime window is planned for your workload and data strategy. We agree continuity requirements, coexistence arrangements and acceptance checks with your owners; migration does not carry a universal zero-downtime promise.

Our Azure move ended the platform's prior downtime, and our hotel booking move achieved near-zero post-migration downtime. The cutover window and handling of failed checks are defined for your system.

The 6 Rs are workload strategies. We choose a strategy for each workload based on compatibility, dependencies, cost and operating requirements.

  • Rehost: move to compatible cloud VMs such as Amazon EC2 or Azure VMs with limited application changes.
  • Replatform: adopt managed services such as Amazon RDS or Azure SQL while retaining the core application, with adaptations where needed.
  • Refactor or re-architect: redesign application components for the target requirements.
  • Repurchase: replace the workload with a product, accounting for data, interfaces and licences.
  • Retire: remove a workload with owner approval and a plan for records and dependencies.
  • Retain: keep it where it remains suitable or where constraints require it.

An estate can combine several strategies; a migration need not rewrite every application.

A migration readiness assessment delivers a written basis for the move and its execution scope.

  • Current-state applications, data, integrations, licences and dependencies.
  • Target options on AWS, Azure or Google Cloud and their workload trade-offs.
  • Per-workload recommendations across the 6 Rs.
  • A wave sequence and the operating constraints for cutover.
  • A total cost of ownership (TCO) outlook including target and parallel-running costs.

This is our cloud migration consulting engagement: fixed scope, quoted on its own. Your decision-maker reviews the recommendations before execution is commissioned.

Migrate where the target meets application and operating requirements with an acceptable transition plan and cost forecast. Retaining suitable workloads is also a valid choice.

The assessment compares capacity, deployment, maintenance, data-location and licence needs with the costs of the target and overlap period. It can recommend a mixed estate: rehost some workloads, replatform or refactor others, and retain the ones that fit their current environment. The decision follows the workload requirements.

Public-cloud security depends on the selected services, configuration and operating responsibilities. We plan the controls with your technical and security owners rather than treating the move itself as a security guarantee.

The plan covers identity, network and key controls, access, regions, data paths and retention. Provider responsibilities and applicable legal requirements inform those decisions. unicrew is ISO 27001:2022 and ISO 9001:2015 certified, renewed through a multi-stage audit with Quay Audit UK.

For the assessment, the NDA precedes access. We work from read-only, least-privilege permissions agreed with your technical contact before it starts.

Build access is also least privilege, read-only wherever the work allows, with no write access to production during discovery. For build engagements, we work inside your own cloud environment where your customers, insurers or shippers require it. Cutover permissions are agreed for the execution scope; operating and support access are scoped separately.

Yes, the plan accounts for coexistence while workloads transition. It defines what each estate serves and budgets for the overlap, with source retirement as a dated stage.

A data-warehouse wave may need reporting continuity during loading and comparison; the actual requirements and acceptance checks belong in the plan. Retention, shutdown and contract closure are approved by the responsible owners. A separate review of the target's operating costs is the cloud cost and AI-readiness audit.

Track progress against the workload register and the acceptance criteria for each wave. The plan records which workloads are prepared, moved, checked and accepted, plus open dependencies and the next approved windows.

Your owners verify the application and data result before a wave is accepted. Source workloads, overlap costs and retirement actions remain visible alongside target progress. For a separate cost assessment, the cloud cost and AI-readiness audit addresses the operating-cost side.

Yes. Environment and configuration differences can affect application behavior after a move, so compatibility checks need to cover the application as well as the servers.

Review hostnames and IP configuration, scheduled jobs, file paths, storage access, timezones, locales and latency between components. We map the relevant dependencies and define application and data acceptance with your owners. Where the application needs adaptation, we scope that work as part of its migration strategy.

Compare the application scope, transition plan, acceptance and operating handover.

  • Check what the cited projects moved and what their reported outcomes measured.
  • Review workload strategy, dependencies, cutover decisions and handling of failed checks.
  • Confirm parallel-running costs, source retirement, artifact rights and the operating owner.
  • Verify organizational credentials and the professional qualifications relevant to the work.

unicrew has AWS Certified Solutions Architects and ISTQB-certified QA engineers. Our ISO 27001:2022 and ISO 9001:2015 certifications were renewed through a multi-stage audit with Quay Audit UK.

We are a fit for migrations that need application, data and integration engineering alongside the cloud target. We assess the running system and carry the commissioned technical work through cutover, handover and planned source retirement.

Your workload owners approve business requirements, operating windows and acceptance. We document the strategy, dependencies and transition responsibilities so the proposal covers the application as well as its hosting. A continuing team or separately scoped operating service can support the roadmap after the move.

Yes. We run cloud migrations for companies in the United States and Europe, and we have an office in Ormond Beach, Florida. Reviews from our US clients are on our client reviews page.

unicrew has 100+ senior in-house engineers across six countries company-wide; the project managers and engineers you work with operate from Ukraine, Poland, Estonia and the UK. We agree working-hour overlap, meetings and reporting with you before work starts, and most engagements start within two to four weeks.