7 Common Mistakes in Software Requirements Specification

The seven most common SRS mistakes, from unclear objectives to missing detail, and how to spot and fix each one before development starts.

Volodymyr KhitsiakSenior Marketing Manager

Published · Updated

Share

7 Common Mistakes in Software Requirements Specification

The seven most common mistakes in a software requirements specification (SRS) are unclear objectives, leaving out key stakeholders, overlooking non-functional requirements, ambiguous language, failing to prioritize features, neglecting to update the SRS, and insufficient detail. Getting the SRS right is not optional: when projects miss their goals, PMI’s research on requirements management found inaccurate requirements management to be the primary cause almost half the time. This guide walks through each mistake with an example of what it costs and practical tips to fix it.

What is a software requirements specification, and why does it matter?

A software requirements specification (SRS) is the document that defines what a product must do: its functions, capabilities, quality attributes, and constraints. It gives everyone involved, stakeholders and developers alike, a shared understanding of the target objectives so they can work together to build a product that satisfies everyone. Skimp on it and you rarely save a penny.

Many requirements failures start with underestimating how complex the project is. That can drag the process out, cause budget overruns, or produce software that does not meet user needs. Bad SRS practices like unintentional duplication, omissions, and unspecified requirements lead to miscommunication, neglected details, and ambiguous requirements that can ultimately ruin a project.

Here are the seven mistakes people most often make when writing an SRS.

Mistake 1: Lack of clear objectives

“Clear objectives are the compass that guides the entire development process,” says Ihor Prudyvus, Engineering Director at unicrew.

In an SRS, this mistake looks like requirements with no stated goal or measure of success. The fix is to tie every requirement to a measurable objective.

But what happens when those objectives are missing or unclear? “Picture this: you set out on a road trip without a specific destination. Would you end up where you wanted? Probably not. The same logic applies to software development. Without clear objectives, projects can quickly veer off course, leading to feature creep, delays, and budget overruns,” adds Ihor.

Here is a startling fact: when organizations explained why their strategic initiatives failed, the most common answer was a lack of clearly defined objectives and milestones to measure progress, cited 37% of the time in PMI’s Pulse of the Profession 2017. That gap is cheap to close in the specification and expensive to close once the build is under way.

Take a simple task management tool. Because objectives were unclear, stakeholders kept adding new features until the team was building a full-scale project management suite. This happened to one company whose initial budget was $100,000 and timeline was six months. The final outcome was a $150,000 cost and a 12-month timeline: 50% over budget and twice the planned six months.

How can you keep your project out of this trap?

“Start by asking the right questions,” said Ihor:

  • What exactly are we trying to achieve?
  • How will we measure success?
  • Are the goals realistic and relevant to our overall mission?

By defining specific, measurable, achievable, relevant, and time-bound (SMART) objectives from the outset, you keep everyone on the same page about the requirements of the software. Regularly revisiting and refining those objectives keeps the project on track and prevents costly deviations. Clear goals are not just nice to have; they are essential for guiding your project to success.

Mistake 2: Not involving key stakeholders

“Involving stakeholders early and often is not just a good practice, it’s a necessity,” emphasizes Oleksandr Trofimov, CTO at unicrew. “Their input ensures the product meets both user and business needs, making them an integral part of the development process.”

In this mistake, the SRS gets written without input from the people who will use, run or pay for the system. Name every stakeholder group, and review the SRS with each one before development starts.

But what happens when key stakeholders are left out of the loop? Picture a house built without consulting the future homeowners. The result is a house that does not fit their needs or preferences, which then means expensive adjustments. “A similar situation happens in software development. If users, the main stakeholders, are not included in the requirements stage, the final product does not reach the functionality that end users are longing for,” adds Oleksandr.

Picture a company that rolls out a new customer relationship management (CRM) system to simplify sales, but skips the sales team during the SRS phase. Soon after go-live, the system proves hard to use and cuts against the way the sales team actually works. Fixing it takes another $500,000 and six months of substantial changes, and productivity suffers the whole time.

Support from the top matters just as much. PMI’s Pulse of the Profession 2016 found that when more than 80% of an organization’s projects have an engaged executive sponsor, 76% of its projects meet their goals, against 46% where sponsor support is weaker. Stakeholders belong in the SRS from the first workshop, not after go-live.

How do you involve stakeholders in the SRS?

Start by identifying all stakeholders, such as users, managers, and customers, then get answers to questions like:

  1. Who is going to be using this product?
  2. Whose input is critical to the success of the project?

Get those answers from the relevant parties, and if they are the end users, engage as many of them as possible from the beginning until the work is done.

“By including the key stakeholders from the early stage, you build the product on a consensus of what users need and make sure business targets are achieved. It lowers the chance of spending extra money on the new system and helps the project succeed when it is first released,” adds Oleksandr Trofimov, CTO at unicrew.

Mistake 3: Overlooking non-functional requirements

“Security, scalability, and performance are not just buzzwords; they are the pillars of a robust software system,” asserts Oleksandr Trofimov, CTO at unicrew.

An SRS with this gap says what the system does but not how fast, how securely or at what scale it must do it. A non-functional requirements section with measurable targets closes it.

It is easy to focus on what a system does, but how it performs those functions under various conditions is equally important. That is what makes non-functional requirements matter so much in software development.

“Say a start-up decides to launch a new e-commerce platform and puts the emphasis on features like product listings and payment processing, while leaving aside non-functional requirements like scalability. The platform was very good at first, but as it became popular it started to struggle, overloading during heavy shopping and eventually crashing,” adds Oleksandr.

Then, during a big holiday sale, site traffic rose tenfold. Because scalability was never planned for, server overloads and downtime followed, souring the mood of waiting shoppers. It took an extra $200,000 and three months for the company to restructure the system to cope with the increased load, which hurt user satisfaction and meant significant lost revenue for the holiday season.

Scalability rarely fails in the demo. It fails on the busiest day of the year, in front of every customer at once. That is why non-functional requirements belong in the SRS next to the features, not in a backlog for later.

How do you capture non-functional requirements?

Do the requirements engineering early, and write the non-functional requirements down next to the functional ones. Start by answering three questions:

  1. How many users should we expect to handle at a single time?
  2. What security requirements apply (authentication, data protection, compliance)?
  3. What level of performance is acceptable under peak load conditions?

“Ensuring the technology can scale, is secure, and is functional guarantees the client a system that handles growth and meets user expectations, so they receive a faster and less risky user experience,” said Oleksandr Trofimov, CTO at unicrew.

Mistake 4: Using ambiguous language

“Precision in specification language prevents misinterpretation and costly errors,” says Andrii Burda, Senior Engineering Manager at unicrew.

Ambiguous language in an SRS document can lead to multiple interpretations, resulting in a product that fails to meet client expectations. Imagine a project where the SRS stated, “The system should efficiently handle a large number of user requests.” What does “large number” mean? And what exactly is “efficiently”? These vague terms led to different interpretations by the development team and the client.

“For instance, a software development firm had to develop an inventory management system. The SRS included the requirement, ‘The system should support many simultaneous users.’ The development team interpreted this to mean up to 100 users, while the client expected it to handle over 1,000 users. This mismatch was discovered only after deployment, resulting in decreased performance and user dissatisfaction. The company had to spend an additional $300,000 and four months upgrading the system to meet the actual needs, delaying the launch and straining the client relationship,” adds Andrii.

Misread requirements are among the costliest mistakes a project can make, and they are one form of the inaccurate requirements management behind PMI’s 47% finding in the introduction. Clear, explicit wording in the SRS gives the client and the team the same ground to work from.

How do you write unambiguous requirements?

“To avoid such issues, follow these tips,” said Andrii Burda, Senior Engineering Manager at unicrew:

  1. Use specific, measurable terms. Replace vague language with clear, verifiable terms. For example, instead of “large number,” specify “up to 1,000 simultaneous users.”
  2. Define performance metrics. Rather than saying “efficiently,” define specific performance metrics, such as “response time under 2 seconds for 95% of requests.”
  3. Include examples and scenarios. Provide examples and scenarios to illustrate requirements. This helps ensure all stakeholders have a common understanding.
  4. Review and validate with stakeholders. Regularly review the SRS with stakeholders to confirm that the language is clear and the requirements are understood uniformly.
  5. Use standardized language and glossaries. Standardized terminology and a glossary of terms cut down on misinterpretation.
  6. Document assumptions and constraints. Record any assumptions and constraints related to the requirements to prevent ambiguity.

By using clear, verifiable terms in your SRS and following these tips, you keep everyone aligned on the requirements and reduce the risk of costly errors and project delays.

Mistake 5: Failing to prioritize features

“Not all features are created equal; prioritizing helps allocate resources effectively,” says Ihor Prudyvus, Engineering Director at unicrew.

Failing to prioritize features can lead to wasted resources, missed deadlines, and project failure. Imagine a company developing a new customer service platform. The team focused on implementing low-priority features like advanced analytics and customizable themes early in the project, so high-priority features such as core ticket management and integration with existing systems were addressed too late. The project ran out of budget before those essential features were fully developed, leaving a platform that could not perform its primary functions effectively.

The stakes are real. McKinsey and the University of Oxford studied more than 5,400 IT projects and found that large ones run, on average, 45% over budget and 7% over time while delivering 56% less value than predicted. Agreed priorities are one of the cheapest defenses, because the team spends its effort on what matters first.

How do you prioritize features in an SRS?

“Here are some key strategies for prioritizing features effectively,” adds Ihor:

  1. Identify business goals and user needs. Align features with overall business goals and end-user needs so the most critical aspects of the project are addressed first.
  2. Engage stakeholders. Involve key stakeholders in the prioritization process to gather diverse perspectives and make sure all critical features are identified and agreed upon.
  3. Assess feasibility and dependencies. Evaluate features’ technical feasibility and dependencies, and prioritize features that are foundational or high-impact with minimal dependencies.
  4. Review and adjust regularly. Prioritization is an ongoing process. Review and adjust priorities regularly based on project progress, feedback, and changing requirements.
  5. Allocate resources accordingly. Ensure budget, time, and human resources go to high-priority features first. This prevents resource exhaustion on low-priority tasks.

By prioritizing features effectively, you ensure that critical components are developed first, resources are used efficiently, and the project stays on track. This approach helps deliver a functional, high-quality product within the allocated budget and timeline.

Mistake 6: Neglecting to update the SRS

“An SRS isn’t a set-and-forget document; it evolves as the project does,” says Andrii Burda, Senior Engineering Manager at unicrew.

Failing to update the software requirements specification after significant changes creates a disconnect between the project’s expected and delivered functionality. Imagine a tech company developing a mobile app that pivots mid-project from a general health tracker to a specialized fitness training tool. The team did not update the SRS to reflect that significant change. As development continued, discrepancies arose between what was being built and what stakeholders expected. The final product lacked essential fitness-specific features and included redundant health-tracking functionality. This mismatch led to user dissatisfaction and required an additional $150,000 and three months to rectify post-launch.

How do you keep the SRS current?

“To avoid such pitfalls, it’s crucial to keep the SRS up to date,” adds Andrii. Here are key strategies to ensure your SRS remains a living document:

  1. Schedule regular reviews. Set regular intervals to review and update the SRS so it stays aligned with the project’s evolving goals and requirements.
  2. Document major changes immediately. Whenever there is a significant change in scope, objectives, or features, update the SRS promptly to reflect it.
  3. Engage stakeholders in updates. Involve all relevant stakeholders in the review and update process so everyone has a clear understanding of any changes.
  4. Maintain version control. Use version control systems to track SRS changes. This keeps a clear history of modifications and ensures everyone works with the latest version.
  5. Communicate updates clearly. When updates are made to the SRS, communicate the changes clearly to the entire team, including detailed explanations of what changed and why.
  6. Align updates with development milestones. Sync SRS updates with key development milestones so the document stays relevant and reflects the current project status.

“By keeping the SRS alive and evolving with the project, you can prevent misunderstandings, ensure all team members and stakeholders are on the same page, and deliver a product that meets expectations. This approach mitigates risk and enhances the project’s overall success,” said Andrii Burda, Senior Engineering Manager.

Mistake 7: Insufficient detail

“Every detail might seem minor individually, but collectively they define the system’s success,” says Ihor Prudyvus, Engineering Director at unicrew.

An SRS that lacks detail invites misunderstandings, misinterpretations, and extensive rework during development. Imagine a software company developing an online learning platform. The SRS vaguely described the user authentication process as a “secure login.” It did not specify the type of authentication method, the security protocols to be used, or the integration with third-party identity providers. During development, the team implemented a basic password authentication system, believing it met the requirement. When stakeholders reviewed the progress, they realized the system did not support the multi-factor authentication (MFA) they expected. This oversight led to significant rework, costing an additional $100,000 and two months to implement the necessary security features.

How do you add the right level of detail?

“To avoid such scenarios, it’s crucial to ensure your SRS is detailed and comprehensive,” adds Ihor. Here are some practical tips to achieve this:

  1. Break down requirements. Turn high-level requirements into detailed, actionable items, such as environment-specific requirements for each use case. Specify the environment and infrastructure needed to run the software, so everyone can see what to build, why, and for whom.
  2. Include detailed descriptions. Describe every feature, function, and constraint, and the purpose each one serves. For example, instead of the short “Login to a secure area,” write “Users sign in through the company’s OpenID Connect identity provider (built on OAuth 2.0) and confirm with a second factor: an authenticator app or a hardware security key.”
  3. Use diagrams and models. Visual tools such as activity flow diagrams, wireframes, and use case diagrams can clarify intricate requirements and ease comprehension of system interactions.
  4. Specify acceptance criteria. Determine crystal-clear acceptance criteria for each requirement. This creates a common understanding of when a requirement is fully met and acceptable to all parties.
  5. Review and refine. Continually refine the software requirements document with stakeholders and team members, using questions like “Are all the specifications of the SRS clear to the stakeholders?” and “What new insight could be added to the document?” Keep refining based on the suggestions you receive and your own reflections.

Two more rules keep requirements testable and free of premature design. Write one requirement per statement, each with its own ID, so it can be tested and traced on its own: “The system shall export the report as PDF and email it to the manager” is two requirements, not one. And state the need rather than the design, unless the design is a real constraint: “Managers can see every order more than two days overdue without exporting data” is verifiable, and still leaves the team free to choose the best screen for it.

“Concentrating on detail and transparency in your SRS can reduce the chances of expensive, time-consuming rework and put your project on a smoother track. Remember that the devil is in the details, so thorough documentation of the entire system is a good pointer to a successful project,” says Ihor.

Final thoughts on software requirements specifications

Completing a strong software requirements specification and avoiding these common pitfalls will shape the result of any software development project. Clear objectives, stakeholder consultation, non-functional requirements, exact language, prioritized features, regular updates, and a detailed specification document are the backbone of a solid SRS. Each characteristic is essential for completing the project on budget and on time, and for keeping the stakeholders involved satisfied.

Want a second pair of eyes on your requirements before the build starts? Our business analysts can review an existing requirements document, clarify features and acceptance criteria, and write the functional and non-functional requirements your engineers will build against. The team includes analysts holding CBAP, AAC and PMP certifications. See our business analysis services. Contact us to talk it through.

Need this built, not just read about?

Tell us what you are building. We will map the fastest route from where you are now to a working product.

Book a scoping call

Thank you

Thanks for your message. We will get in touch with you shortly.